What are RAMS?

RAMS combine a risk assessment, which identifies the hazards of an activity and how each risk is controlled, with a method statement, which sets out step by step how the work will be done safely. Clients and principal contractors typically require RAMS before work starts on site, and they form the basis of the briefing every operative receives.

What's included

  • Method statement describing the task, sequence and resources
  • Risk assessment covering each hazard and its controls
  • Site-specific details: location, access, permits and emergency arrangements
  • Separate RAMS for internal and subcontract labour where needed
  • Revision control and approval through the Client Portal

How EJH produces RAMS

We produce RAMS from the specific task and site, drawing on a proven library of common hazards and controls so nothing routine is overlooked, then tailor every assessment to the activity in hand. Approved RAMS are published to your Client Portal, so the current version is always available.

What it means for your project

  • Work can start on time, with RAMS approved in advance
  • Consistent, thorough hazard coverage on every job
  • Clear briefings for everyone on site
  • A documented record of how risk was managed

Frequently asked questions

What does RAMS stand for?

RAMS stands for Risk Assessment and Method Statement: the documents that identify the hazards of a task, how they are controlled, and the safe sequence of work.

Are your RAMS site-specific?

Yes. Each set is tailored to the task and site, including access, permits and emergency arrangements, rather than being a generic template.

What format are they supplied in?

Method statements are supplied as editable Word documents and risk assessments as spreadsheets, so they can be reviewed and updated easily.